The SEND Regulations 2014 give a council 20 weeks to issue an education, health and care plan. In 2025, South Tyneside met that deadline for 92% of new plans. The England average was 46.1%.

Quick reference

Plans issued within 20 weeks, 2025
92% (161 of 175 plans)
England average
46.1%
Rank
24 of 148 reporting councils
6-week decisions on time
84.1% (England: 87.4%)
Assessment requests refused
39.4% (England: 26.6%)

How long does an EHCP take in South Tyneside?

The law allows 20 weeks; in 2025, South Tyneside issued 92% of new EHC plans within that deadline (161 of 175 plans, excluding exceptional cases), ranking it 24 of 148 reporting English councils. The England average was 46.1%.

The trend since 2019

2019
100% (160)
2020
100% (104)
2021
89.6% (125)
2022
89.2% (167)
2023 †
74.6% (197)
2024
70.9% (151)
2025
92% (175)

† DfE changed the collection method between calendar years 2022 and 2023; treat cross-break trend comparisons with care. Bracketed figures are the number of plans each percentage is based on, excluding cases the regulations treat as exceptional. Counting exceptional cases as well, the 2025 figure is 87%.

The two statutory clocks

Two deadlines apply to every request. The council must decide whether to carry out an assessment within 6 weeks (regulation 5), and any final plan is due within 20 weeks of the original request (regulation 13).

  • Decision within 6 weeks: South Tyneside decided on time for 84.1% of requests in 2025. England: 87.4%.
  • Final plan within 20 weeks: South Tyneside issued on time for 92% of new plans. England: 46.1%, down from 46.4% the year before.
  • Waits over a year: 0% of plans issued in 2025 took longer than 52 weeks.

Requests and refusals

South Tyneside received 353 requests for an EHC needs assessment in 2025 and refused to assess 39.4% of them. The England average refusal rate was 26.6%. Requests that are refused never reach the plan stage, so they are not counted in the 20-week timeliness figure above; the two are worth reading together.

Demand

South Tyneside maintained 1,861 EHC plans as at January 2026, up 46% from January 2019. Rising caseloads stretch the same statutory deadlines, which is context for the timeliness figures above, though the duties are unchanged by demand.

When families challenged the council

In 2025, 67 mediation cases and 15 SEND Tribunal appeals related to South Tyneside's assessment-request decisions. Across England, most decided appeals are found at least partly in the family's favour.

Annual reviews

Every EHC plan must be reviewed at least annually, and the council must give its decision within 4 weeks of the review meeting. In 2025, South Tyneside completed a review for 75.5% of the 1,578 plans where one was due, and gave its decision within 4 weeks in 84.7% of cases (England: 47.6%).

Area SEND inspection

South Tyneside has not yet been inspected under the Area SEND framework introduced in January 2023. Earlier inspections under the previous framework may exist on Ofsted's reports site.

What the regulations require

The Special Educational Needs and Disability Regulations 2014 set the deadlines on this page: the 6-week decision (regulation 5) and the 20-week final plan (regulation 13), with limited exceptions set out in regulation 13(3). These are duties, not targets. In 2025, South Tyneside met the 20-week requirement in 92% of cases. New to the process? Start with what an EHCP is and how to apply.

The wider system is changing: the government's February 2026 white paper proposes reserving EHCPs for the most complex needs by 2035, with reassessments from September 2029. Nothing changes today, and every deadline above still applies in full. What the SEND reforms actually say.

If a deadline has been missed

Support while you wait

Many families arrange tutoring while an assessment or plan is delayed. Tutors on Tutorperch set their own rates and you contact them directly.

About this data

Source: DfE "Education, health and care plans", reporting year 2026 (published 2026-06-25), covering calendar year 2025. Inspection outcomes are from the Ofsted and CQC Area SEND management information. Figures describe South Tyneside as the local authority responsible for EHC plans. Contains public sector information licensed under the Open Government Licence v3.0. This page is updated when the DfE publishes each annual release.

Ready to find a tutor?

Free to browse, free to message. £9.99 one-off to unlock contact-sharing with one tutor.

Find a tutor near you

Related

Find a tutor near you

Browse free, message tutors directly. Unlock contact-sharing with one tutor when you're ready.

Written by Robert S. Last reviewed